According to the regulations in force on December 5, 2025, the land could be constructible depending on the submitted project. Gradually from March 1, 2026, a new mapping of flood zones will be applied and will have the effect of prohibiting construction on this lot. Note that an activity being carried out on the land (permit obtained and construction started) in a flood zone (20-100 years) which is subject to a change in the delimitation and which, on the date of entry into effect of this change (March 1, 2026), will become impacted by the new flood zone, and can still proceed without further formality.
Source: ROYAL LEPAGE DU QUARTIER, Real Estate Agency
General information
Category
Land / Lot
Style
Lot
Lot
Front
45 meters
Depth
189.68 meters
Area
5430.9 square meters
Water area name
Baie de Carillon, Riv des Outaouais
Evaluation (2025)
Lot
103 799 $
Expenses
Monthly
Yearly
Municipal Taxes (2025)
60 $
717 $
School taxes (2025)
6 $
66 $
Total:
65 $
783 $
Distinctive features
Lot with mixed wood, Other : clearing on a plateau and low wooded level, Cul-de-sac, No neighbours in the back
Proximity
Other
Sewage system
None
Topography
Other : Los slope to the bay
View
Water
Water supply
None
Zoning
Residential
Addenda
Zoning type: V-204 (resort -- residential)
Charming wooded land with potentially constructible area on
a higher plateau
From the plateau, a wooded trail leads you to the lower
area leading to the waterfront of Carillon Bay on Ottawa
River, near the ecological sanctuary of Carillon Island
protecting wildlife and birds.
The lower area is mainly wooded composed of silver maple
trees where you will enjoy the Zen, calm to bird songs.
In the Summer season, small shallow-draft boats such as
canoes, kayaks, paddle boats, sailboards, paddle boards,
kite surfers, water bikes, Scuba diving, "Snorkeling", not
counting fishing, are activities allowing to appreciate
nature. When the water level allows it: Jet Ski & Sea Doo.
In the winter season: ice fishing, ice skating.
A lot with plenty of possibilities in a peaceful area
halfway between Montreal and Gatineau. Quick access to
Highway 50 going to Gatineau (1h25) or goint to Montreal
(1h15) depending of traffic of the day.
All the necessary steps with the competent authorities for
the validation and/or zoning modification concerning the
BUILDING or to obtain a permit allowing the construction of
a building are at the SOLE CHARGE AND RESPONSIBILITY OF THE
BUYER. The Seller and the Broker do not have the
required skills and will not assume this responsibility
Take your steps with your construction plan with the
urban planning (450) 537-3527 x 2739 to obtain your
building permit and start your construction site before
March 1, 2026!